Carved stone runs on two clocks, and neither of them belongs to you.
The first is freight and production lead time, measured in weeks. The second is Chinese New Year, when the factories that cut and polish your stock close for two to three weeks and much of the workforce travels home for the year's biggest holiday.
You can plan around the first clock. You cannot plan around the second one nearly as late as most buyers assume — and that is the mistake this article is meant to prevent.
Work backwards, always
The instinct is to order when you need stock. The correct move is to count backwards from the date it has to be on your shelf, because every step in between takes a fixed amount of time and none of it can be hurried at the end.
Four things sit between your order and your shelf:
- Production. Confirmed against your actual order, not a published figure — see the honest note further down.
- Inspection and packing. Every piece inspected by hand, then individually boxed and secured in export cartons.
- Freight transit. Sea runs roughly 30–45 days door to door to the United States including customs; air runs roughly 5–10 days. Australia is broadly similar.
- Your own receiving and listing. Unpacking, photography, tagging, listing — usually one to three weeks before stock is genuinely sellable.
Only items 3 and 4 are predictable enough to put in a table. Item 1 is where you need a written date from your supplier.
The seasons that matter for this product
These are the ship-by dates, not the order dates. Subtract your confirmed production lead time to get your order date — and be careful what that number actually contains, because on a small order most of it is queue rather than carving. Why lead times vary explains how to get the breakdown.
| Season | Stock on shelf by | Ship from China (sea) | Ship from China (air) |
|---|---|---|---|
| Halloween (31 Oct) | Late September | Early August | Mid September |
| Christmas (25 Dec) | Early November | Mid September | Late October |
| Valentine's Day (14 Feb) | Early February | Late December | Late January |
| Mother's Day (US, May) | Late April | Mid March | Mid April |
| Summer and tourist season | May | Late January | Mid April |
Two notes on that table. First, sea freight to the US East Coast and Gulf runs longer than to the West Coast — add roughly a week. Second, the sea column for Valentine's Day looks comfortable and is not: it lands directly on top of the Chinese New Year shutdown, which the next section explains.
The date most buyers miss
Chinese New Year falls on 6 February 2027. The statutory holiday is short, but the practical shutdown is not: factories typically wind down in the last week or two of January and do not return to full capacity until early March, because workers travel home and return over a period of weeks rather than days.
Treat late January to late February 2027 as production that will not happen, and early March as a ramp rather than a restart.
That single fact rearranges the first half of your year:
- Valentine's Day stock must be produced before the shutdown. If you need it on a shelf in early February, it has to be finished and shipped in December or early January. Ordering in January is too late.
- Mother's Day is the first season after the shutdown and is the one most buyers miss planning for. Production resumes properly in March; if you order then, you are competing for capacity with everyone else who waited.
- Anything you want before mid-April is a pre-shutdown order. That means committing in November or December, when the holiday still feels a long way off.
There is a second-order effect worth knowing: freight capacity tightens in the two weeks before the shutdown as everyone rushes to ship. Booking early is cheaper as well as safer.
Halloween is the season this product was made for
If you sell carved skulls, Halloween is not a side season — for many retailers it is the largest one of the year, and it is the one buyers plan for least.
The advantage is that a skull carving does not have to be a novelty item to work in October. The same piece that sells as a decor object in March sells as a Halloween centrepiece in October with nothing changed but the display and the timing. That means Halloween stock is not dead stock in November; it goes back onto the shelf as ordinary inventory.
The catch is the calendar. Halloween stock has to be on your shelf by late September, which means shipping in early August by sea — and that is a decision made in June or July, when nobody is thinking about October.
Day of the Dead (1–2 November) follows immediately and rewards the same stock, particularly in markets with Mexican-American customers. It is the one seasonal moment where skull imagery is culturally specific rather than generic, and buyers who plan for it early get a second October.
Matching stone to season
Not every design suits every season, and the stone colour does most of the work:
- Halloween and Day of the Dead. Obsidian, black and red obsidian, kambaba jasper, dragon bloodstone. Dark, matte, high-contrast — these photograph well against a dark display and read clearly from a distance.
- Valentine's Day. Rose quartz, and the pinks and reds generally. This is the most colour-specific season in the calendar, and the one where ordering the wrong stone leaves you with stock you cannot move until next year.
- Christmas. Gift-sized pieces rather than large ones, because the buying decision is made by one person for another and is price-sensitive. Smaller carvings in clear quartz and fluorite move best.
- Summer and tourist season. Tiger eye and labradorite, which flash in daylight and are bought by people who picked the piece up in person.
If you are ordering breadth to test what sells, order across seasons rather than across materials. One dark stone, one pink stone and one light stone will tell you more about your customers than five shades of grey.
What we can compress, and what nobody can
We can move quickly on a confirmed order, and we will tell you honestly what is possible.
What we will not do is publish a single lead-time figure, because it would be wrong for most orders. Lead time genuinely depends on material, size, carving detail, finish and packaging, so we quote a realistic schedule against your actual order, in writing, as part of the quotation. See how to read a wholesale quote for what that schedule should contain.
What nobody can compress is the Chinese New Year shutdown, freight transit, or a ship that has already sailed. Those are calendar facts, and the only way to beat them is to plan earlier than feels necessary.
If you are reading this in October
For Christmas stock this year, the sea freight window closed in September. That is arithmetic, not pessimism.
What is still possible is air freight, which puts stock on your shelf in roughly one to two weeks once it is produced, at a materially higher cost per kilogram. On dense stone that cost is significant, so air freight for Christmas usually only makes sense on smaller, higher-value pieces rather than the heavy ones.
The better use of October is to plan the first half of next year properly. Place the Valentine's and Mother's Day orders now, ahead of the January shutdown and ahead of the buyers who will be enquiring in January while production is stopped. See how to build your first order if this is your first season.
What to ask us, and when
Tell us the date stock has to be on your shelf and what the occasion is. We will work backwards with you — production, inspection, packing, freight — and confirm the schedule in writing before you commit.
Send us your season and your deadline and we will tell you what is realistic, including when the honest answer is that the date has already passed.